So far, BecoSearch only lists publicly funded projects that receive (or have received) funding from German federal ministries and are listed in the federal government’s funding catalog. In the future, BecoSearch will be expanded to include projects that are funded by other funding bodies (such as the federal states or the EU) as well. Until then, we will list such projects on secondary electrochemichal energy storages below.
Projects funded by federal ministries
This section lists projects that are funded by German federal ministries but are not included in the German federal government’s funding catalogue.
PowerSwap
Schnellwechselbatterie inkl. Batteriemanagementsystem und Systemintegration (Quick-change battery including battery management system and system integration)
Funding Code: 16KN075029
Duration: 01.07.2020 to 31.12.2022
Amount of Funding: keine Angabe
Sponsor: BMWE, Zentrales Innovationsprogramm Mittelstand (ZIM)
Project participants: Hochschule für Technik und Wirtschaft Berlin, e.telligent GmbH, HJS Emission Technology GmbH & Co. KG, Lechmann Engineering GmbH, SKDK GmbH
about PowerSwap
press release
SafeBat
Duration: 15.06.2020 to 14.06.2022
Amount of funding: no information
Sponsor: BMWi, AiF, Vinnova
Project participants: FiberCheck GmbH, Havel metal foam GmbH, RISE SICOMP, AP&T, Fraunhofer-Institut für Werkzeugmaschinen und Umformtechnik IWU
KME-2nd-Life
Controlling- und Maintenance System zur Schnellbewertung von gebrauchten Lithium-Traktionsbatterien sowie einer Ansteuerung für 2nd-Life Stromspeicher (Controlling and maintenance system for rapid assessment of used lithium traction batteries and control system for 2nd-life energy storage systems)
Duration: 01.07.2017 to 30.06.2020
Amount of funding: no information
Sponsor: BMWi, Zentrales Innovationsprogramm Mittelstand (ZIM)
Project participants: BEDM GmbH, Fenecon GmbH, Technologiezentrum Energie der Hochschule Landshut
LeiKonBin
Entwicklung von Bindermaterialien und Kontaktierungstechnologien für die Fertigung von Batteriezellen auf der Basis elektrisch leitfähiger Klebstoffe (Development of bonding materials and contacting technologies for the manufacture of battery cells based on electrically conductive adhesives)
Duration: 01.04.2018 to 31.03.2020
Amount of funding: 214.270 Euro
Total budget: 376.090 Euro
Sponsor: BMWi, AiF
Project participants: Technische Universität Braunschweig – Institut für Füge- und Schweißtechnik und Institut für Ökologische und Nachhaltige Chemie
Project description as PDF
Hochstromfähiges Lithium-Ionen-Batteriemodul (High-current lithium-ion battery module)
Duration: 01.06.2017 to 31.12.2019
Amount of funding: 300.000 Euro
Total budget: 750.000 Euro
Sponsor: BMWi, AiF
Project participants: Celono Dr.-Ing. Thomas Forchert, Fraunhofer Institut für Silizium-Technologie ISIT
Project description as PDF
Raffzyklen
Raffzyklen für die beschleunigte Alterung von Lithium-Ionen-Batterien zur Verkürzung der Freigabezeiten von neuen Baumustern (Rack cycles for accelerated ageing of lithium-ion batteries to shorten release times for new designs)
Duration: 01.08.2017 to 31.07.2019
Amount of funding: no information
Sponsor: BMWi, AiF, Forschungsvereinigung Antriebstechnik e. V.
Project participants: Volkswagen AG, Institut für Stromrichtertechnik und Elektrische Antriebe der RWTH Aachen
to the homepage
Effi.CoM
Efficient Optical, Thermal and Acoustic Coating Monitoring in Advanced Production Processes
Duration: 01.01.2016 to 31.12.2017
Amount of funding: no information
Sponsor: BMWi, Zentrales Innovationsprogramm Mittelstand (ZIM), AiF
Project participants: ISEA der RWTH Aachen, Fries Research & Technology GmbH
to the homepage
EU-funded projects (except EFRE)
GIGABAT
Sustainable and digitalized GIGAfactory for BATtery production with made-in-Europe machinery
Duration: 01.07.2023 to 31.12.2026
Amount of funding: 7.999.613,50 Euro
Funding amount for German beneficiaries: no information
Total budget: 10.865.496,25 Euro
Sponsor: EU Komission – Horizon (Grant agreement ID: 101104094)
Project management agency (governmental): CINEA
Project participants: PowerCo SE (DEU), Manz Italy Srl (ITA), Technische Universität Braunschweig (DEU), Verkor (FRA), Izertis Sociedad Anonima (ESP), Comau SPA (ITA), Excelitas Noblelight GmbH (DEU), Matthews International GmbH (DEU), Jagenberg Converting Solutions GmbH (DEU), Rise Research Insitutes of Sweden AB (SWE), Ferroglobe Innovation SL (ESP), Zeppelin Systems GmbH (DEU), Netzsch Trockenmahltechnik GmbH (DEU), Liplanet e. V. (DEU), Fondazione Icons (ITA), Kampf LSF GmbH & Co. KG (DEU), Lebbing Automation and Drivers GmbH (DEU)
to the Cordis database
to the homepage
HEALING BAT
advanced sensing, monitoring and self-HEALING mechanisms to self-repair BATteries
Duration: 01.06.2023 to 31.05.2027
Amount of funding: 3.613.415,00 Euro
Funding amount for German beneficiaries: no information
Total budget: 3.613.415,00 Euro
Sponsor: EU Komission – Horizon Europe (Grant agreement ID: 101104006)
Project participants: Technische Universität Dortmund (DEU), Helmholtz-Zentrum Berlin für Materialien und Energie GmbH (DEU), Technische Universiteit Delft (NLD), IDNEO Technologies S. A. U. (ESP), Institut de Recerca en Energia de Catalunya (ESP), F. Iniciativas, Consultadoria e Gestão, Unipessoal, Lda. (PRT), SupraPolix BV (NLD)
to the Cordis database
IsoFoamComp
Development of a functional insulation and foam material for battery housings
Duration: 01.06.2023 to 31.05.2026
Amount of funding: 879.719,00 Euro
Funding amount for German beneficiaries: no information
Total budget: 1.074.908,00 Euro
Sponsor: M-era.net (SAB)
Project participants: ISOVOLTA AG (AUT), Polymer Competence Center Leoben GmbH (AUT), Fraunhofer-Institut für Werkzeugmaschinen und Umformtechnik IWU (DEU), L’Association pour l’environnement et la sécurité en Aquitaine (FRA)
about IsoFoamComp
FutuRaM
Future Availability of Secondary Raw Materials
Duration: 01.06.2022 to 31.05.2026
Amount of funding: 11.675.969 Euro
Funding amount for German beneficiaries: no information
Total budget: 11.675.969 Euro
Sponsor: EU Komission – Horizon Europe (Grant agreement ID: 101058522)
Project participants: Waste of Electrical and Electronical Equipment Forum AISBL (BEL), United Nations Institute for Training and Research (CHE), Bundesanstalt für Geowissenschaften und Rohstoffe (DEU), Boliden Mineral AB (SWE), Bureau de recherches géologiques et minières (FRA), Chalmers tekniska högskola AB (SWE), Geološki zavod Slovenije (SVN), Geologian tutkimuskeskus (FIN), Kushnir Duncan (SWE), Ludwig-Maximilians-Universität München (DEU), Lovisagruvan AB (SWE), Recharge (BEL), Sveriges geologiska undersökning (SWE), Sociedade Portuguesa de Inovação Consultadoria Empresarial e Fomento da Inovação S. A. (PRT), Technische Universität Berlin (DEU), Univerzitet u Beogradu – Rudarsko-geološki fakultet (SRB), Universiteit Leiden (NLD), Vlaamse Instelling voor Technologisch Onderzoek N.V. (BEL), Weeecycling (FRA), ERION Compliance Organization SCARL (ITA)
to the Cordis database
to the homepage
Marbel
Manufracturing and assembly of modular and reusable EV battery for environment-friendly and leightweight mobility
Duration: 01.01.2021 to 31.03.2025
Amount of funding: 9.889.360,33 Euro
Funding amount for German beneficiaries: no information
Total budget: 11.703.385,00 Euro
Sponsor: EU Komission – Horizon 2020 (Grant agreement ID: 963540)
Project participants: Technische Hochschule Ingolstadt (DEU), Fundació Institut de Recerca en Energia de Catalunya (ESP), Erevnitiko Panepistimiako Institouto Systimaton Epikoinonion kai Ypologiston (GRC), Idiada Automotive Technology SA (ESP), AVL Deutschland GmbH (DEU), AVL Italia SRL (ITA), Centro Ricerche Fiat SCpA (ITA), Powertech Systems (FRA), Otc Engineering Sociedad Limitada (ESP), Sintef AS (NOR), Ficosa Automotive SL (ESP), Asas Alüminyum Sanayi ve Ticaret Anonim Şirketi (TUR), A Agrati SPA (ITA), Fraunhofer-Institut für Werkzeugmaschinen und Umformtechnik IWU (DEU), Tes Sustainable Battery Solution France (FRA)
to the Cordis database
to the homepage
CURRENT DIRECT
Swappable Container Waterborne Transport Battery
Duration: 01.01.2021 to 31.12.2023
Amount of funding: 11.989.875,00 Euro
Funding amount for German beneficiaries: 2.089.978,75 Euro
Total budget: 11.989.875,00 Euro
Sponsor: EU Komission – Horizon 2020-EU.3.4. (Grant agreement ID: 963603)
Project Participants: Wärtsilä Norway AS (NOR), Lloyd’s Register EMEA IPS (GBR), Blackstone Technology GmbH (DEU), RHOE (GRC), CNET Centre for New Energy Technologies SA (PRT), Vlaamse Instelling voor Technologisch Onderzoek NV (BEL), Aviloo GmbH (AUT), Kotug International BV (NLD), Foreship OY (FIN), Universiteit Hasselt (BEL), Spear Power Systems BV (BEL), Umicore SA (BEL), Leclanché GmbH (DEU)
to the Cordis database
BIG-MAP
Battery Interface Genome – Materials Acceleration Platform
Duration: 01.09.2020 to 31.08.2023
Amount of funding: 19.997.812,50 Euro
Funding amount for German beneficiaries: 4.059.531,25 Euro
Total budget: 19.997.812,50 Euro
Sponsor: EU Komission – Horizon 2020-EU.1.2. (Grant agreement ID: 957189)
Project participants: Danmarks Tekniske Universitet (DNK), Uppsala universitet (SWE), Karlsruher Institut für Technologie (DEU), Centre national de la recherche scientifique (FRA), Westfälische Wilhelms-Universität Münster (DEU), Commissariat à l’énergie atomique et aux énergies alternatives (FRA), Kemijski institut (SVN), Sintef AS (NOR), Politecnico di Torino (ITA), Fraunhofer-Institut für Silicatforschung ISC (DEU), Chalmers tekniska högskola AB (SWE), Politechnika Warszawska (POL), Agencia Estatal Consejo Superior de Investigaciones Científicas (ESP), Technische Universiteit Delft (NLD), Consiglio Nazionale delle Ricerche (ITA), École polytechnique fédérale de Lausanne (CHE), University of Cambridge (GBR), University of Oxford (GBR), Tartu Ülikool (EST), The University of Liverpool (GBR), European Synchrotron Radiation Facility (FRA), Institut Max von Laue – Paul Langevin (FRA), Synchrotron Soleil Société civile (FRA), Fundación Cidetec (FRA), Energy Materials Industrial Research Initiative (BEL), Umicore SA (BEL), Solvay SA (BEL), BASF SE (DEU), Northvolt AB (SWE), Universitat Basel (CHE), IT-Universitetet i København (DNK), Dassault Systemes Deutschland GmbH (DEU), Forschungszentrum Jülich (DEU), SAFT (FRA), Universitat Wien (AUT)
to the Cordis database
to the homepage
3beLiEVe
Bereitstellung der 3b-Generation von LNMO-Zellen für den xEV-Markt von 2025 und
darüber hinaus (Provision of the 3b generation of LNMO cells for the xEV market from 2025 onwards and beyond)
Duration: 01.01.2020 to 30.06.2023
Amount of funding: 10.833.759,99 Euro
Funding amount for German beneficiaries: 2.218.977,83 Euro
Total budget: 10.833.759,99 Euro
Sponsor: EU Komission – Horizon 2020 (Project-ID: 875033)
Project participants: Austian Institute of technology GmbH (AUT), Centro Ricerche Fiat S. p. A. (ITA), Envalior (NLD), Insplorion Sensor Systems AB (SWE), Valeo Systèmes Thermiques SAS (FRA), Valeo Klimasysteme GmbH (DEU), Centro de Investigación Cooperativa de Energías Alternativas Fundación, CIC energiGUNE Fundazioa (ESP), ISEA Institut für Stromrichtertechnik und Elektrische Antriebe an der RWTH Aachen (DEU), Custom Cells Itzehoe GmbH (DEU), Fraunhofer-Institut für Integrierte Systeme und Bauelementetechnologie IISB (DEU), NXP Semiconductors France (FRA), Topsoe A/S (DNK), Elkem ASA (NOR), Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile (ITA), Sensichips SRL (ITA), Avesta Holding (BEL), Commissariat à l’énergie atomique et aux énergies alternatives (FRA), Manz Italy Srl (ITA), Arkema France SA (FRA), Volvo Technology AB (SWE), Société nouvelle d’affinage des métaux – SNAM SAS (FRA)
to the Cordis database
LiPLANET
Li-Ion Cell Pilot Lines Network
Duration: 01.01.2020 to 31.12.2021
Amount of funding: 1.998.636,25 Euro
Funding amount for German beneficiaries: 653.401,25 Euro
Total budget: 1.998.636,25 Euro
Sponsor: EU Komission – Horizon 2020 (Project-ID: 875479)
Project participants: Commissariat à l’énergie atomique et aux énergies alternatives (FRA), Austrian Institute of Technology GmbH (AUT), Fundación CIDETEC (ESP), Avesta Holding (BEL), Energy Materials Industrial Research Initative (BEL), KIC InnoEnergy SE (NLD), Institut für Partikeltechnik an der TU Braunschweig (DEU), VDI/VDE Innovation + Technik GmbH (DEU)
to the Cordis database
to the homepage
CarE-Service
Circular economy business models for innovative hybrid and electric mobility through advanced reuse and remanufacturing technologies and services
Duration: 01.06.2018 to 30.11.2021
Amount of funding: 6.229.632,45 Euro
Funding amount for German beneficiaries: 1.448.382,50 Euro
Total budget: 7.722.365,75 Euro
Sponsor: EU Komission – Horizon 2020 (Grant agreement ID: 776851)
Project participants: Consiglio Nazionale Delle Ricerche (ITA), Linköpings universitet (SWE), Envirobat España SL (ESP), Prodigentia – Tecnologias de Informação SA (PRT), Agencia Estatal Consejo Superior de Investigaciones Científicas (ESP), Consorzio Nazionale Raccolta e Riciclo (ITA), Stellantis Europe S. p. A (ITA), Radici Novacips S. p. A. (ITA), Circular Economy Solutions GmbH (DEU), IMA Materialforschungs- und Anwendungstechnik GmbH (DEU), Fraunhofer-Institut für Werkzeugmaschinen und Umformtechnik IWU (DEU), Avicenne Développement (FRA), CIA Automation and Robotics Srl (ITA), E-Vai Srl (ITA), Joint Research centre – European Comission (BEL), Haiki Cobat S. p. A. Societa’ Benefit (ITA)
to the Cordis database
to the homepage
FlowCamp
European Training Network to improve materials for high-performance, low-cost next- generation redox-flow batteries
Duration: 01.09.2017 to 31.08.2021
Amount of funding: 3.796.578,23 Euro
Funding amount for German beneficiaries: 996.865,92 Euro
Total budget: 3.796.578,23 Euro
Sponsor: EU Komission – Horizon 2020 (H2020-EU.1.3.1, ID Finanzhilfevereinbarung: 765289)
Project participants: Fraunhofer ICT (DEU), Elestor BV (NLD), Bar Ilan University (ISR), HUN-REN Természettudományi Kutatóközpont (HUN), Centre national de la recherche scientifique (FRA), Jenabatteries GmbH (DEU), Amer-Sil SA (LUX), Züricher Hochschule für Angewandte Wissenschaften (CHE), Vysoká škola chemicko-technologická v Praze (CZE), Institut für Maschinenelemente der Universität Stuttgart (DEU), Johnson Matthey PLC (GBR)
to the Cordis database
iModBatt
Industrial Modular Battery Pack Concept Addressing High Energy Density, Environmental Friendliness, Flexibility and Cost Efficiency for Automotive Applications
Duration: 01.10.2017 to 30.09.2020
Amount of funding: 5.180.794,01 Euro
Total budget: 6.351.473,75 Euro
Funding amount for German beneficiaries: 1.093.678,13 Euro
Sponsor: EU Komission – Horizon 2020 (Project-ID: 770054)
Project participants: Parque Tecnológico de Miramón (ESP), Rescoll (FRA), Tyva Energie (FRA), MIBA AG (AUT), Heksagon Mühendislik ve Tasarım A. Ş. (TUR), Lehrstuhl und Institut für Stromrichtertechnik und Elektrische Antriebe (ISEA) an der RWTH Aachen (DEU), Freemens (FRA), Austrian Institute of Technology GmbH (AUT), Cleancarb Sàrl (LUX), E.Go Mobile AG (DEU), Accurec-Recycling GmbH (DEU), Pro Autmation GmbH (AUT), Commissariat a l’ Energie Atomique et aux Energies Alternatives (FRA), Renault SAS (FRA)
to the Cordis database
to the homepage
Everlasting
Electric Vehicle Enhanced Range, Lifetime And Safety Through INGenious battery management
Duration: 01.09.2016 to 31.08.2020
Amount of funding: 8.201.423,75 Euro
Funding amount for German beneficiaries: 2.993.022,50 Euro
Sponsor: EU Komission – Horizon 2020 (Project-ID: 713771)
Project participants: Vlaamse Instelling voor Technologisch Onderzoek N. V. (BEL), Commissariat à l’énergie atomique et aux énergies alternatives (FRA), Siemens Industry Software SAS (FRA), Lehrstuhl für Elektrische Energiespeichertechnik (EES) an der Technischen Universität München (DEU), TÜV Süd Battery Testing GmbH (DEU), Algonion LTD (ISR), Lehrstuhl und Institut für Stromrichtertechnik und Elektrische Antriebe (ISEA) an der RWTH Aachen (DEU), Lion Smart GmbH (DEU), Technische Universiteit Eindhoven (NLD), Voltia AS (SVK), VDL Bus & Coach BV (NLD), VDL Enabling Transport Solutions BV (NLD)
to the Cordis database
to the homepage
ALISE
Advanced Lithium Sulphur battery for xEV
Duration: 01.06.2015 to 31.05.2019
Amount of funding: 6.899.33 Euro
Sponsor: EU Komission – Horizon 2020 (Project-ID: 666157)
Project Participants: Acondicionamiento Tarrasense Asociación (ESP), Avicenne Développement (FRA), Asociación Centro Tecnológico CEIT (ESP), Fico-triad SA (ESP), Varta Microbattery GmbH (DEU), Oxis Energy Limited (GBR), Centro Técnico de SEAT SA (ESP), Solvionic (FRA), Fraunhofer IWS (DEU), Technische Universität Dresden (DEU), Politecnico di Torino (ITA), C-Tech Innovation Limited (GBR), Daramic SAS (FRA), Idneo Technologies S. A. U. (ESP), R & D Vehicle Systems Limited (GBR), Vayon Energy Storage limited (GBR), Cranfield University (GBR), Williams Advanced Engineering Limited (GBR)
to the Cordis database
OPTEMUS
Optimised Energy Management and Use
Duration: 01.06.2015 to 28.02.2019
Amount of funding: 6.390.634 Euro
Sponsor: EU Komission – Horizon 2020
Project participants: Virtual Vehicle Research GmbH (CHE), Keysight Technologies France SAS (FRA), Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e. V. (DEU), IFP Energies nouvelles (FRA), Centro Ricerche Fiat S. C. p. A. (ITA), Continental Automotive GmbH (DEU), Mondragon Goi Eskola Politeknikoa Jose Maria Arizmendiarrieta S. Coop. (ESP), Marelli Suspension Systems Italy S. p. A. (ITA), Università degli Studi di Salerno (ITA), BAX Innovation Consulting SL (ESP), Scuola Superiore di Studi Universitari e di Perfezionamento Sant’Anna (ITA), DENSO Thermal Systems S. p. A. (ITA), Denso Automotive Deutschland GmbH (DEU), Rheinisch-Westfälische Technische Hochschule Aachen (DEU), ESI Germany GmbH (DEU), Vitesco Technologies GmbH (DEU)
to the Cordis database
Project description as PDF
TILOS
Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage
Duration: 01.02.2015 to 31.01.2019
Amount of funding: 11.008.622,50 Euro
Total budget: 13.752.903,95 Euro
Funding amount for German beneficiaries: 2.531.085,27 Euro
Sponsor: EU Komission – Horizon 2020 (Project-ID: 646529)
Project participants: Sonick SPA (ITA), Commissariat à l’énergie atomique et aux énergies alternatives (FRA), University of East Anglia (GBR), Instituto Tecnológico de Canarias S. A. (ESP), Lehrstuhl und Institut für Stromrichtertechnik und Elektrische Antriebe (ISEA) an der RWTH Aachen (DEU), Youncos GmbH (DEU), Université de Corse Pascal Paoli (FRA), Open Energi Limited (GBR), SMA Solar Technology AG (DEU), Diachiristis Ellinikou Diktyou Dianomis Elektrikis Energeias A. E. (GRC), World Wide Fund for Nature Greece (GRC), Eunice Ferousa A. E. (GRC), Schleswig-Holstein Netz AG (DEU), Kungliga Tekniska Högskolan (SWE), Eurosol Projekt und Management GmbH (DEU)
to the Cordis database
JOSPEL
Development of a Novel Energy Efficient Climate System for the Optimization of Interior Temperature Control Management in Electrical Vehicles
Duration: 01.05.2015 to 01.11.2018
Amount of funding: 6.668.288 Euro
Sponsor: EU Komission – Horizon 2020
Project description as PDF
SPICY
Silicon and Polyanionic Chemistries and Architectures of Li-ion Cell for High Energy Battery
Duration: 01.05.2015 to 30.04.2018
Amount of funding: 6.896.054 Euro
Sponsor: EU Komission – Horizon 2020
Project participants: Commissariat à l’énergie atomique et aux énergies alternatives (FRA), Tekna Plasma Europe (FRA), Karlsruher Institut für Technologie (DEU), Wavestone Luxembourg S. A. (LUX), Technische Universität München (DEU), Belife (BEL), Eidgenössische Materialprüfungs- und Forschungsanstalt (CHE), Fundación CIDETEC (ESP), PROLLION SAS (FRA), Centre Technique Industriel de la Plasturgie et des Composites (FRA), Hahn-Schickard-Gesellschaft für angewandte Forschung e. V. (DEU), Vlaamse Instelling voor Technologisch Onderzoek N. V. (BEL), Recupyl SAS (FRA), Forschungszentrum Jülich GmbH (DEU), Prayon S. A. (BEL)
to the Cordis database
Project description as PDF
Mun-E-P 2
Municipal E-Bus Planner 2
Duration: 01.01.2015 to 30.06.2018
Amount of funding: 685.000 Euro
Total budget: 710.000 Euro
Sponsor: Europäisches Technologieinstitut (EIT) durch Climate-KIC
Project participants: RWTH Aachen (DEU), ISEA Institut für Stromrichtertechnik und Elektrische Antriebe (DEU), ebusplan GmbH (DEU), Birmingham City Council (GBR), Technische Universiteit Delft (NLD), Berliner Verkehrsbetriebe A. ö. R. (DEU), Transport for London (GBR), Transport for West Midlands (GBR), QBuzz BV (NLD), Wiener Linien GmbH & Co KG (AUT)
Project description as PDF
European Regional Development Fund (EFRE)
GIS-MS
Gesicherte Industrielle Stromversorgung für Micro- und Smart-grids (Secure industrial power supply for microgrids and smart grids)
Project number: EFRE‐0801570
Duration: 2021 to 2027
Amount of funding: no information
Total budget: no information
Sponsor: Ministerium für Wirtschaft, Industrie, Klimaschutz und Energie des Landes Nordrhein-Westfalen, EFRE/JTF-Programms NRW 2021–2027 (EFRE)
Project participants: Universität Paderborn, Hoppecke Batterien GmbH & Co. KG, AEG Power Solutions GmbH, Avasition GmbH, BatterieIngenieure GmbH, Next Kraftwerke GmbH
about GIS-MS
ELuStat
Entwicklung eines Eisen‐Luft‐Batteriestacks als stationärer Energiespeicher für die Photovoltaik (Development of an iron-air battery stack as a stationary energy storage device for photovoltaics)
Project numbers: EFRE-0801047 and EFRE-0801043
Duration: 01.01.2019 to 31.12.2021
Amount of funding: 719.624,24 Euro
Total budget: 799.582,49 Euro
Sponsor: Leitmarktagentur NRW, Klimaschutzwettbewerb ErneuerbareEnergien.NRW 2. Call (EFRE)
Project participants: Fraunhofer-Institut für Umwelt-, Sicherheits- und Energietechnik UMSICHT, Hochschule Ruhr West
to the homepage
FSTORE
Grenzüberschreitende Plattform für Forschung an zukünftigen Energiespeichern und deren Integration (Cross-border platform for research into future energy storage systems and their integration)
Duration: 01.02.2017 to 31.07.2020
Amount of funding: no information
Total budget: no information
Sponsor: INTERREG V Freistaat Bayern – Tschechische Republik 2014 – 2020 (EFRE)
Project participants: Technologiezentrum Energie (TZE) der Hochschule für angewandte Wissenschaften Landshut, New Technologies Research Centre (NTC) der Universität Westböhmen
about FSTORE
DUETT – Sub-project 4
Diesel-Hybridfahrzeuge für eine umweltbewusste Mobilität: neuartige, echtzeitfähige Simulationsmodelle von elektrischen Komponenten des hybridisierten Antriebsstrangs (Diesel hybrid vehicles for environmentally conscious mobility: innovative, real-time simulation models of electrical components in hybridised powertrains)
Project number: EFRE-0800844
Duration: 01.05.2017 to 30.05.2020
Amount of funding: 190.437,50 Euro
Total budget: 210.437,50 Euro
Sponsor: Europäische Union & OP EFRE NRW
Project participants: Lehrstuhl und Institut für Stromrichtertechnik und Elektrische Antriebe der RWTH Aachen
to the homepage
InTreS
Innovative Trägermaterialien zur Optimierung der Stromableiter von elektrischen Speichern (Innovative carrier materials for optimising the current conductors of electrical storage devices)
Project number: EFRE-0800612
Duration: 01.01.2017 to 31.12.2019
Amount of funding: no information
Total budget: 1.975.477 Euro
Sponsor: Europäische Union & OP EFRE NRW
Project participants: Institut für Schweißtechnik und Fügetechnik der RWTH Aachen, Lehrstuhl Production Engineering of E-Mobility Components der RWTH Aachen, Coatema Coating Machinery GmbH, Aurubis Stolberg GmbH & Co. KG, Production.net AC GmbH, Futavis GmbH
Assoziierte Partner: Schunk Sonosystems GmbH, Bender GmbH Maschinenbau- und Streckmetallfabrik, Alantum Europe GmbH, Hollomet GmbH, Covestro Deutschland AG
Project description as PDF
to the homepage
Redox-Herne
Redox-Flow-Batterien für klimafreundliche Eigenheime (Redox flow batteries for climate-friendly homes)
File reference number: EU-1-2-047
Duration: 01.01.2017 to 31.12.2019
Amount of funding: 952.382 Euro
Total budget: 1.429.784 Euro
Sponsor: Land Nordrhein-Westfalen unter Einsatz von Mitteln aus dem Europäischen Fonds für regionale Entwicklung (EFRE) 2014-2020 „Investitionen in Wachstum und Beschäftigung“
Project management agency (governmental): LeitmarktAgentur.NRW. Projektträger Jülich
Project participants: Fraunhofer-Institut für Umwelt-, Sicherheits- und Energietechnik UMSICHT, Stadtwerke Herne AG, Volterion GmbH
to the homepage
ExLaLIB
Steigerung der Energie- und Materialeffizienz durch den Einsatz der Extrusions- und Lasertrocknungstechnologie im Fertigungsprozess von Elektroden für Lithium-Ionen-Batteriezellen (Increasing energy and material efficiency through the use of extrusion and laser drying technology in the manufacturing process of electrodes for lithium-ion battery cells)
Duration: 09.03.2016 to 31.12.2019
Amount of funding: 1.799.620 Euro
Total budget: 1.799.620 Euro
Sponsor: LeitmarktAgentur.NRW (Projektträger ETN), Europäischer Fonds für regionale Entwicklung (EFRE.NRW)
Project participants: WWU Münster, Münster Electrochemical Energy Technology (MEET), Philips Photonics GmbH, RWTH Aachen, Lehrstuhl Production Engineering of E-Mobility Components (PEM)
Project description as PDF
to the homepage
EnerPrax
Energiespeicher in der Praxis (Energy storage in practice)
Duration: 01.12.2016 to 30.11.2019
Amount of funding: ca. 1.494.652 Euro
Total budget: 1.916.221 Euro
Sponsor: Ministerium für Wirtschaft, Energie, Industrie, Mittelstand und Handwerk des Landes NRW, Zuwendungen des Landes Nordrhein-Westfalen unter Einsatz von Mitteln aus dem Europäischen Fonds für regionale Entwicklung (EFRE) 2014-2020 „Investition in Wachstum und Beschäftigung“
Project participants: Fachbereich Energie Gebäude Umwelt der FH Münster – University of Applied Sciences, Gelsenwasser AG, gwi – Gas- und Wärme-Institut Essen e. V., Gemeinde Saerbeck, SaerVE – Saerbecker Ver- und Entsorgungsgesellschaft mbH
Project description as PDF
to the homepage
BatteReMan
Steigerung der Ressourceneffizienz im Lebenszyklus der Lithium-Ionen-Batterie durch Remanufacturing (Increasing resource efficiency in the life cycle of lithium-ion batteries through remanufacturing)
Duration: 15.02.2016 to 31.01.2019
Amount of funding: 995.974 Euro
Sponsor: Europäischer Fonds für regionale Entwicklung (EFRE)
Project participants: PEM der RWTH Aachen, StreetScooter GmbH, Futavis GmbH
to the homepage
ePadFab
Innovative Technologien zur industriellen Herstellung integrierter, großformatiger Bipolarbatterien (Innovative technologies for the industrial production of integrated, large-format bipolar batteries)
Duration: 20.11.2014 to 19.11.2017
Amount of funding: 5.100.000 Euro
Sponsor: Sächsische Aufbaubank und Europäischer Fonds für Regionale Entwicklung – EFRE
Project description as PDF
Projects funded by the DFG
POLiS
Post Lithium Storage Cluster of Excellence
Duration: 2019 to 2026
Amount of funding: 47 Mio. Euro
Sponsor: Deutsche Forschungsgesellschaft (DFG)
Funding code: EXC 2154
Project participants: Karlsruher Institut für Technologie (KIT) – Institut für Anorganische Chemie und Helmholtz-Institut Ulm für Elektrochemische Energiespeicherung (HIU), Universität Ulm, Zentrum für Sonnenenergie- und Wasserstofforschung Baden-Württemberg (ZSW) – Geschäftsbereich Elektrochemische Energiewandlung und -Speicherung, Justus-Liebig-Universität Gießen – Physikalisch-Chemisches Institut
to the homepage
SE2A
Sustainable and Energy-Efficient Aviation
Duration: since 2019
Sponsor: Deutsche Forschungsgesellschaft (DFG)
Funding Code: 390881007
Project participants: Technische Universität Braunschweig, Deutsches Zentrum für Luft- und Raumfahrt e.V., Gottfried Wilhelm Leibniz Universität Hannover, Hochschule für Bildende Künste Braunschweig, Physikalisch-Technische Bundesanstalt, Technische Universität Delft
about SE2A
to the homepage
mobilEM
Graduiertenkolleg „Integrierte Energieversorgungsmodule für straßengebundene Elektromobilität“ (nur teilweise mit Bezug zu Batteriethemen)
Research training group ‘Integrated energy supply modules for road-based electric mobility’ (only partially related to battery topics)
Duration: 01.04.2018 to 30.09.2022
Amount of funding: 8.738.100 Euro
Total budget: 8.738.100 Euro
Sponsor: Deutsche Forschungsgesellschaft (DFG)
Funding code: GRK 1856/2
Project participants: Rheinisch-Westfälische Technische Hochschule Aachen – Institut für Regelungstechnik (IRT), Institut für Stromrichtertechnik und elektrische Antriebe (ISEA), Institut für Kraftfahrzeuge (ika), Institut für Elektrische Maschinen (IEM), Lehrstuhl für Wärme- und Stoffübertragung (WSA), Lehrstuhl für Verbrennungskraftmaschinen (vka), Institut für Technische Verbrennung (itv) und Lehrstuhl für Anorganische Chemie und Elektrochemie, Universität Duisburg Essen – Lehrstuhl für Energietechnik
Project description as PDF
Projects funded by the DBU
Untersuchung der Weiterverwendung von Traktionsbatterien als stationärer Energiespeicher in privaten Haushalten (Investigation into the reuse of traction batteries as stationary energy storage devices in private households)
Duration: 01.04.2020 to 31.03.2023
Amount of funding: 468.896,00 Euro
Sponsor: Deutsche Bundesstiftung Umwelt (DBU)
Aktenzeichen: 33874/01
Project participants: Lehrstuhl für Zuverlässigkeitstechnik und Risikoanalytik der Bergischen Universität Wuppertal
to the DBU database
Optimierung der Entwicklung von Fest-Elektrolyten für Lithium-Ionen-Batterien – Erhöhte Sicherheit mittels temperierbarer Messzellen mit Online-Messung der Probendicke zur präzisen Bestimmung der Leitfähigkeit
(Optimisation of the development of solid electrolytes for lithium-ion batteries – Increased safety through temperature-controlled measuring cells with online measurement of sample thickness for precise determination of conductivity)
Duration: 08.06.2018 to 01.12.2019
Amount of funding: 124.970,00 Euro
Sponsor: Deutsche Bundesstiftung Umwelt (DBU)
Aktenzeichen: 34562/01
Project participants: rhd instruments GmbH & Co. KG, Karlsruher Institut für Technologie (KIT) Helmholtz-Institut Ulm (HIU)
to the DBU database
Entwicklung eines intelligenten und cloudbasierten Batterie-Monitoring-Systems für mobile wie auch akkubetriebene IT-Systeme (Development of an intelligent, cloud-based battery monitoring system for mobile and battery-powered IT systems)
Duration: 14.02.2017 to 30.06.2018
Amount of funding: 123.000,00 Euro
Sponsor: Deutsche Bundesstiftung Umwelt (DBU)
Aktenzeichen: 33834/01
Project participants: Systec & Solutions GmbH, enOware GmbH
to the DBU database
Entwicklung, Aufbau und Test einer neuartigen elektronischen Schaltungstopologie zur Kombination von Batteriespeichersystemen, Batterie-Balancing-Systemen, Umrichtern und Ladeschaltungen (Development, construction and testing of a novel electronic circuit topology for combining battery storage systems, battery balancing systems, converters and charging circuits)
Duration: 08.12.2015 to 30.04.2018
Amount of funding: 299.365,00 Euro
Sponsor: Deutsche Bundesstiftung Umwelt (DBU)
Aktenzeichen: 33032/01
Project participants: Smart Power GmbH & Co. KG, Universität der Bundeswehr München, Hochschule Osnabrück
to the DBU database
Fertigungskonzept zum Bau einer Coffee-Bag-Lithium-Luft-Zelle (Manufacturing concept for the construction of a coffee bag lithium-air cell)
Duration: 03.12.2014 to 30.09.2016
Amount of funding: 327.500,00 Euro
Sponsor: Deutsche Bundesstiftung Umwelt (DBU)
Aktenzeichen: 31452/01
Project participants: ADE-Mechanik GmbH, IVT – Institut für Ionenstrahl und Vakuumverfahrenstechnik e. V., Karlsruher Institut für Technologie (KIT) Helmholtz-Institut Ulm (HIU)
to the DBU database
Entwicklung und Evaluierung einer neuartigen Umrichtertopologie zur Kombination von Batterie, Balancing-Systemen, Umrichtern und Ladeschaltungen (Development and evaluation of a novel converter topology for combining batteries, balancing systems, converters and charging circuits)
Duration: 13.08.2014 to 31.12.2015
Amount of funding: 124.738,00 Euro
Sponsor: Deutsche Bundesstiftung Umwelt (DBU)
Aktenzeichen: 31873/01
Project participants: MaxSolar GmbH, Universität der Bundeswehr München, Hochschule Osnabrück
to the DBU database
Projects funded at federal state level
PowerCore
Untersuchen und Erforschen von Einflussgrößen, Abhängigkeiten und Auswirkung auf das Materialverhalten von Lithium während deren Nutzung in mobilen Akkuplattformen (Investigating and researching influencing factors, dependencies and effects on the material behaviour of lithium during its use in mobile battery platforms)
Duration: 01.08.2024 to 31.07.2027
Total budget: no information
Sponsor: Bayerisches Staatsministerium für Wirtschaft, Landesentwicklung und Energie
Funding code: MW-2403-0004
Project participants: Technische Hochschule Deggendorf
Project description by THD
KISS
KI-basiertes Sortieren von Spektren (AI-based sorting of spectra)
Duration: 01.04.2022 to 31.03.2025
Total budget: no information
Sponsor: Hessische Staatskanzlei im Bereich der Ministerin für Digitale Strategie und Entwicklung
Funding code: 21_0005_2A
Project participants: rhd instruments GmbH & Co. KG, Technische Universität Darmstadt
Project description by TU Darmstadt
PRIMA Batteries
PRedictive Industrial Maintenance Agent for Batteries
Duration: 01.11.2021 to 31.12.2024
Amount of funding: 557.620 Euro
Total budget: 909.761 Euro
Sponsor: Bayerisches Staatsministerium für Wirtschaft, Landesentwicklung und Energie (STMWI)
Funding code: DIK0384/01
Project participants: e.telligent GmbH, Technische Hochschule Ingolstadt, IP Camp GmbH,
Triathlon Batterien GmbH Glauchau (assoziiert)
to the homepage
SafeMuMob
Erkennen von versteckten Beschädigungen und Vermeiden von kritischen Ereignissen an Li-lonen-Akkumulatoren in elektrischen Kleinstfahrzeugen (Detecting hidden damage and preventing critical incidents in lithium-ion batteries in small electric vehicles)
Duration: 01.01.2021 to 31.12.2023
Total budget: no information
Sponsor: Bayerisches Staatsministerium für Wissenschaft und Kunst
Project participants: Hochschule für angewandte Wissenschaften München, FAZU GmbH, Ridetronic GmbH
to the homepage
ZDR-EMIL
Nachhaltiges Zentrum für Demontage und Recycling – Elektromobilität (Sustainable centre for dismantling and recycling – electric mobility)
Duration: 01.04.2020 to 31.03.2023
Amount of funding: 16.250.000 Euro
Sponsor: Hessisches Ministerium für Wissenschaft und Kunst (Zukunftsfonds Hessen)
Project participants: Fraunhofer-Einrichtung für Wertstoffkreisläufe und Ressourcenstrategie IWKS in Hanau
Press release
GrEEn
Grüne Elektrochemische Energiespeicher (Green electrochemical energy storage devices)
Duration: 28.04.2017 to 31.12.2020
Amount of funding: 3.000.000 Euro
Total budget: 3.000.000 Euro
Sponsor: Ministerium für Wirtschaft, Innovation, Digitalisierung und Energie des Landes Nordrhein-Westfalen
Funding code: 313-W044A
Project participants: Westfälische Wilhelms-Universität (WWU) Münster, Institut für Anorganische und Analytische Chemie (IAAC), WWU Münster, Institut für Biologie und Biotechnologie der Pflanzen (IBBP), WWU Münster, Institut für Physikalische Chemie (IPC), WWU Münster, MEET – Batterieforschungszentrum Münster, Rheinisch-Westfälische Technische Hochschule (RWTH) Aachen, Institut für Stromrichtertechnik und Elektrische Antriebe (ISEA)
assoziierter Partner: Forschungszentrum Jülich GmbH, Helmholtz-Institut Münster (HI-MS)
Project description as PDF
ADD SPICE
Additive Fertigungsverfahren und Materialien für innovative Energiespeicherzellen (Additive manufacturing processes and materials for innovative energy storage cells)
Duration: 01.02.2017 to 31.01.2020
Contract sum: 562.916 Euro
Total budget: 562.916 Euro
Auftragsgeber: Baden Württemberg Stiftung gGmbH
Auftragsforschung: Projektnummer IAF_004
Project participants: Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburger Materialforschungszentrum der Universität Freiburg (FMF)
Project description as PDF
FastStorageBW II
Erforschung neuartiger Hochleistungs- und Hochenergiespeicherzellen und deren Fertigungsmethodik für Ihre Herstellung. Vorindustrielle Erprobung und Skalierbarkeit der Technologie für eine spätere Großserienfertigung in Baden-Württemberg.
(Research into novel high-performance and high-energy storage cells and their manufacturing methods. Pre-industrial testing and scalability of the technology for subsequent large-scale production in Baden-Württemberg.)
Duration: 01.01.2015 to 31.12.2017
Amount of funding: 24.990.673 Euro
Total budget: 64.078.649 Euro
Sponsor: Ministerium für Wirtschaft, Arbeit und Wohnungsbau Baden-Württemberg
Project participants: Fraunhofer-Institut für Produktionstechnik und Automatisierung IPA, Fraunhofer-Institut für Chemische Technologie ICT, Varta Microbattery GmbH, Universität Stuttgart, Institut für Energieeffizienz in der Produktion (EEP), Universität Stuttgart, Institut für Steuerungstechnik der Werkzeugmaschinen und Fertigungseinrichtungen (ISW), Universität Stuttgart, Institut für Strahlwerkzeuge (IFSW), Karlsruher Institut für Technologie KIT, Zentrum für Sonnenenergie- und Wasserstoff-Forschung Baden-Württemberg ZSW, SEW Eurodrive GmbH & Co. KG, viastore systems GmbH, Kromberg & Schubert GmbH & Co. KG, Freudenberg Performance Materials Holding SE & Co. KG
assoziierter Partner: Daimler AG Group Research & MBC Development, Dr. Ing. h.c. F. Porsche AG, Festool GmbH
Project description as PDF
ACoS
Aktive Glasflake-Composite-Separatoren für Lithium-Ionen-Batterien (Active glass flake composite separators for lithium-ion batteries)
Duration: 01.10.2014 to 31.01.2018
Amount of funding: 611.500 Euro
Total budget: 1.110.002 Euro
Sponsor: Bayerisches Staatsministerium für Wirtschaft, Infrastruktur, Verkehr und Technik (BayNW)
Funding code: PTJ-1308-0002
Project participants: Universität Bayreuth, Füller Glastechnologie Vertriebs GmbH, Vitrulan Textile Glass GmbH
assoziierter Partner: Technologie Anwender Zentrum TAZ Spiegelau
Project description as PDF
to the homepage
EEBat
Erforschung dezentraler Energiespeicher zur effizienten Nutzung erneuerbarer Energien und zur Unterstützung der Netzstabilität (Research into decentralised energy storage systems for the efficient use of renewable energies and to support grid stability)
Duration: 01.01.2013 to 31.12.2016 (Field test extended until 31.12.2017)
Amount of funding: 28.800.000 Euro
Sponsor: Bayerisches Staatsministerium für Wirtschaft und Medien, Energie und Technologie
Project participants: Technische Universität München, Bayerischen Zentrum für Angewandte Energieforschung (ZAE), Varta Storage GmbH, KWH Netz GmbH
Project description as PDF
Projects funded by other means
AUForPro
Analytik zur Unterstützung der Lithium-Ionen-Batterie-Forschung, -Produktion und des -Recyclings (Analytics to support lithium-ion battery research, production and recycling)
Duration: no information
Total budget: no information
Sponsor: Bezirksregierung Münster
Funding code: no information
Project participants: Universität Münster
Press release
PulseCycler
Entwicklung neuer Hardware für Zell-Zyklisierung und Untersuchung gepulsten Ladens bezüglich Lebensdauer und Ladegeschwindigkeit (Development of new hardware for cell cycling and investigation of pulsed charging with regard to service life and charging speed)
Duration: 01.05.2025 to 30.04.2027
Total budget: no information
Sponsor: Bayerische Transformations- und Forschungsstiftung
Funding code: AZ-1647-24
Project participants: Pulsetrain GmbH, Battery Sphere GmbH, Hochschule für angewandte Wissenschaften München, Universität der Bundeswehr München
to the homepage
MoBs-RFB
Monitoring und Betriebsstrategie für Redox-Flow-Batterien (Monitoring and operating strategy for redox flow batteries)
Duration: 01.09.2024 to 31.08.2027
Total budget: no information
Sponsor: Bayerische Transformations- und Forschungsstiftung
Funding code: AZ-1620-24
Project participants: Hochschule für angewandte Wissenschaften München, Kermi GmbH
to the homepage
KI-M-Bat
KI-basierte Modulare Batteriesysteme für Gewerbe- und Netzanwendungen (AI-based modular battery systems for commercial and grid applications)
Duration: 2023 to the end of 2025
Total budget: no information
Sponsor: Bayerische Transformations- und Forschungsstiftung
Funding code: AZ-1563-22
Project participants: STABL Energy GmbH, Fenecon GmbH, Die Hochschule für angewandte Wissenschaften Kempten, Technische Universität München, TUM Zentrum für Gekoppelte Intelligente Energiesysteme
to the homepage
press release
FutureFlexPro
Duration: 01.03.2021 to 31.12.2021
Total budget: no information
Sponsor: Interne Programme der Fraunhofer-Gesellschaft
Project participants: Fraunhofer-Institut für Werkzeugmaschinen und Umformtechnik IWU, Fraunhofer-Institut für Fertigungstechnik und Angewandte Materialforschung IFAM, Fraunhofer-Institut für Schicht- und Oberflächentechnik IST, Fraunhofer-Institut für Holzforschung (Wilhelm-Klauditz-Institut WKI), Fraunhofer-Institut für Arbeitswirtschaft und Organisation IAO
to the homepage
KOBIBATT
Neuartige vollverschweißte Bipolarbatterie (Novel fully welded bipolar battery)
Duration: 01.01.2018 to 31.12.2020
Total budget: no information
Sponsor: Interne Programme der Fraunhofer-Gesellschaft
Project participants: Fraunhofer-Institut für Keramische Technologien und Systeme IKTS, Fraunhofer IVV, Außenstelle für Verarbeitungsmaschinen und Verpackungstechnik IVV, Fraunhofer-Institut für Fertigungstechnik und Angewandte Materialforschung IFAM, Fraunhofer-Institut für Angewandte Polymerforschung IAP
to the homepage
Unfunded projects
brine4power
Entwicklung einer Kavernen-Redox-Flow-Batterie mit bis zu 120 MW und 700 MWh (Development of a cavern redox flow battery with up to 120 MW and 700 MWh)
Duration: Juni 2017 to the end of 2023 (ended prematurely in 2018)
Total budget: 2 Mio. Euro für Phase 1 und 2 (zwei Testanlagen) und 100 bis 120 Mio. Euro für Phase 3 (Pilotanlage)
Project participants: EWE Gasspeicher GmbH, Friedrich-Schiller-Universität Jena
Report on premature ending of the project (9 December 2018)